Portability: 4 stdlib scripts, no network, nothing submitted anywhere. Fill CSVs, run, keep the output with the technical documentation.
Not legal advice and not a conformity assessment. The manufacturer signs the declaration; on routes B+C and H a notified body decides.
The CRA has two clocks. **Article 14 reporting has applied since 11 September
2026** to every in-scope product on the EU market, including ones shipped years
ago. Everything else applies from 11 December 2027 (Art 71(2)). Teams fail in
predictable ways: nobody can say when they became "aware", class I products are
planned on self-assessment while no harmonised standard is cited, a five-year
support period is set for a router people keep for eight, and the SBOM lists
packages but not what the product depends on.
# 1 - Scope: which products, which class, which route, which CSIRT?
python scripts/cra_scope_classifier.py --inventory assets/inventory.example.csv
# 2 - Report: is any Article 14 report due or overdue right now?
python scripts/art14_report_clock.py --events assets/events.example.csv
# 3 - Conformity: can we sign the EU declaration of conformity?
python scripts/annex_i_gap_check.py --assessment assets/assessment.example.csv
python scripts/sbom_check.py --sbom assets/sbom.example.cdx.json
Run step 2 first whenever a vulnerability or incident is live: it is the only
step with a 24-hour deadline. --list-categories, --list and --template
print the Annex III/IV categories and the 39 assessment ids.
| Script | Role | Exit codes |
|---|---|---|
scripts/cra_scope_classifier.py | Scope (Art 2), role (Arts 19-22, 24), class (Art 7-8, Annex III/IV), routes (Art 32), legacy (Art 69), support period (Art 13(8)), reporting CSIRT (Art 14(7)) | 0 clear · 2 findings · 3 bad input · 4 blocked |
scripts/art14_report_clock.py | 24h / 72h / 14-day / one-month deadlines, content per report, user notice | 0 on time · 2 open · 3 · 4 overdue |
scripts/annex_i_gap_check.py | 39 ids across Annex I Parts I-II, Annex VII, Annex II; NA rules; evidence | 0 ready · 2 gaps · 3 · 4 blocked |
scripts/sbom_check.py | CycloneDX/SPDX JSON, primary component, top-level dependencies, versions, purl/CPE coverage | 0 pass · 2 · 3 · 4 fail |
All support --help, --sample and --output json.
references/reporting_article14.md — dates, triggers, the three clocks, CSIRT routing, legacy products, penalties (7 sources)references/scope_classes_and_routes.md — scope and exclusions, roles, Annex III/IV, Art 32 routes, support period (6 sources)references/essential_requirements_and_evidence.md — every Annex I/II/VII item with typical evidence, retention periods, standards status (8 sources)assets/article14_runbook.md — standing set-up and per-event record for the SRPassets/inventory.example.csv, assets/events.example.csv, assets/assessment.example.csv, assets/sbom.example.cdx.json — input formats