Plan the campaign backward from the deadline. ATC 2026 — the first ACM SIGOPS edition of the former USENIX ATC — runs on a calendar and a review structure that both changed in the transition: an early-June 2026 submission deadline (AoE; 1 vs. 10 June unresolved across renderings — 待核实), a two-round, extended-abstract review, conditional acceptance with shepherding, a separate artifact-evaluation track, and the conference in Hong Kong, 15-18 November 2026. Reopen the SIGOPS call for the exact dates before committing to any of the offsets below.
[T-0 Submission] paired upload: 2-page extended abstract + full paper on atc26.hotcrp.com
[Round one] two reviewers judge each extended abstract; below-bar papers cut early
[Round two] 3-4 reviewers read the full paper of survivors
[Rebuttal] ~1 page: correct factual misreadings; note prior-submission changes if any
[Decision] conditional accept / reject
[Shepherding] a PC shepherd signs off required revisions before final acceptance
[Artifact evaluation] separate post-acceptance AEC track -> Available / Functional / Reproduced
[Camera-ready] de-anonymize, satisfy shepherd, ACM Open Access metadata + production checks
[Nov 15-18] present at the Hong Kong conference; talk video/slides per the venue norm
atc-reproducibility) — provenance cannot be reconstructed at the deadline.atc-writing-style; baselines and honest costs
in place per atc-experiments.atc-author-response).atc-artifact-evaluation). De-anonymize and archive
the artifact in a DOI-issuing repository for the Available badge.atc-camera-ready). Budget for the transition APC
(subsidized for 2026; exact figure per the ACM/SIGOPS terms).[Deadline] confirm the exact early-June AoE day on the SIGOPS call (1 vs 10 June — 待核实)
[Conference] Hong Kong (Hyatt, Shatin), Nov 15-18, 2026 — plan travel/visa early for HK
[Rotation] under SIGOPS, ATC rotates Asia/Europe/North America; next-year location differs
[Artifact] find the AEC submission date on the call for artifacts (separate from camera-ready)
[Backup] if rejected, line up OSDI/NSDI/EuroSys/FAST dates via atc-topic-selection
[ATC workflow stage] planning / drafting / abstract-hardening / submitted / round two / rebuttal / shepherding / artifact / camera-ready
[Critical path] the long-pole task (usually testbed + measurements, then the extended abstract)
[Deadline set] submission (early June AoE), rebuttal, shepherd sign-off, artifact, camera-ready
[Next action] the single most schedule-critical step, with a date
[Risk] the item most likely to slip (provenance pinning / abstract self-containment / shepherd changes)