A comprehensive guide for planning and executing a scientific paper submission for the ISSTA conference. It maps out all critical milestones, including venue fit, evidence locking, submission deadlines, major revisions, and artifact evaluation. The skill provides backward planning heuristics and identifies common failure modes to ensure timely and successful publication.
Get Skill
223 downloads
Overview

ISSTA Workflow

Use this as the project-management skill for an ISSTA submission. Replace every date below with the current official timetable and work backward from the HotCRP deadline — ISSTA's calendar, and even its number of deadlines, changes between editions.

ISSTA is a conference, not a journal: it has no standing editor-in-chief and no article-processing charge. The rotating leadership is the per-edition General Chair and Program Chairs, appointed by ACM SIGSOFT and turning over each year, and the cost model is registration, not APCs — proceedings appear in the ACM Digital Library. Re-check the current organization page rather than carrying a name forward.

Milestones (2026 shape — verify the current cycle)

  • Venue fit: confirm the contribution is genuinely testing-and-analysis, not a broader SE result.
  • Evidence lock: freeze the technique's scope, the subjects and benchmark versions, the baselines, and the artifact plan.
  • Submission deadline (Jan 29, 2026): HotCRP record complete, 18-page anonymous sigconf PDF uploaded, subjects pinned.
  • Author response (Mar 24-26, 2026): rebuttal anchored in submitted evidence.
  • First decision (Apr 16, 2026): Accept, Major Revision, or Reject.
  • Major-Revision deadline (May 21, 2026): revised paper plus a ledger walking every reviewer comment.
  • Final decision (Jun 25, 2026): terminal outcome for revised papers.
  • Artifact evaluation: package for the ACM badges and the Zenodo deposit (separate track/dates).
  • Camera-ready and symposium (Oakland, Oct 3-9, 2026): ACM DL package, registration, in-person presentation.

Backward plan from the paper deadline

Weeks out (heuristic) Testing/analysis milestone
10+ Technique implemented; scope and threat model fixed
8 Subjects and benchmark versions pinned; baselines configured at equal budget
6 Full evaluation runs complete with repeated runs and seeds logged
4 Statistics done (non-parametric test + effect size); tables generated from logs
3 Draft in ACM sigconf; threats-to-validity section written, not stubbed
2 Internal mock review by a testing-literate reader; artifact smoke-tested
1 Anonymity sweep; HotCRP record; artifact staging anonymized
0 18-page PDF on HotCRP; confirm the abstract matches

These offsets are planning heuristics only — anchor each to the current official timetable, never to a previous cycle's calendar or deadline count.

Failure modes by stage

  • Treating Major Revision as a soft reject: teams that coast after April lose the June decision they could have won by walking the reviewers' ledger.
  • Deferring the artifact to after acceptance: the badge and Zenodo work is real engineering, and a tool that only ran on the authors' cluster earns nothing.
  • Leaving sigconf reflow to the final week: two-column code listings and full-width tables overflow late.
  • Picking private subjects over an established benchmark: an evaluation that cannot be compared to prior work invites an external-validity reject that no rebuttal fixes.

Coordination notes

  • Assign one owner for the artifact and Zenodo deposit and another for the anonymity sweep; shared ownership is how both slip.
  • Archive the exact submitted PDF and artifact, because response and Major-Revision replies must quote them precisely.

Output format

[Current stage] idea / evaluation / writing / submission / response / major-revision / accepted
[Next official deadline] <date and source, or unknown>
[Critical path] <three tasks that determine readiness>
[Risk register] <page/anonymity/evaluation/baseline/artifact/presentation>
[Owner map] <task -> person or role>