Skills Productivity Project Planning for MobiSys Submission

Project Planning for MobiSys Submission

v20260724
mobisys-workflow
This guide provides a comprehensive project management workflow for academic submissions to the MobiSys conference. It outlines the critical path, from initial system design and on-device measurement to final paper submission and artifact preparation. The workflow helps users plan backward from the single, crucial December deadline, managing device experiment lead time and mitigating common academic failure modes.
Get Skill
162 downloads
Overview

MobiSys Workflow

Use this as the project-management skill for a MobiSys submission. Replace every date with the current official timetable and work backward from the one hard December cutoff on the mobisys<yy>.hotcrp.com/deadlines page.

MobiSys is a conference, not a journal: no standing editor-in-chief, no article-processing charge. The rotating leadership is the per-edition General Chairs and Program Chairs (2026 General Chairs: Fahim Kawsar and Cecilia Mascolo; Program Chairs 待核实). Committees rotate yearly — re-check the current organizing-committee page rather than carrying a name forward.

The one-deadline calendar

Unlike MobiCom and NSDI, which run two deadlines a year, MobiSys runs a single paper deadline in early December feeding the following June conference. There is no second gate this cycle to catch a slip. That single fact governs the whole plan: the device experiments must be finished, not started, before December.

Milestones

  • Venue fit: confirm the contribution is a mobile/embedded system whose device behavior is the result (mobisys-topic-selection).
  • Evidence lock: freeze the system design and finish the on-device measurement campaign — energy, latency, memory, thermal, and any deployment/user study.
  • Paper registration: register title, abstract, authors, and conflicts on HotCRP before the registration cutoff that precedes the paper upload.
  • Paper deadline: upload the anonymous 12-page double-column PDF and required HotCRP fields.
  • Round-1 outcome: early-reject notifications go out; survivors proceed to round 2.
  • Round-2 reviews + rebuttal: read reviews, then draft a scope-limited rebuttal (mobisys-author-response).
  • Notification: archive reviews, rebuttal, and decision.
  • Acceptance: prepare the ACM camera-ready, artifact-evaluation submission, registration, and the June in-person talk and demo.

Backward plan from the December deadline

Weeks out (heuristic) Mobile-systems milestone
12+ System built; measurement harness and power instrument working end to end
8 On-device runs complete on all target devices; energy/latency logged with provenance
6 Deployment or user study done if the claim is a service
4 Full draft sitting in the 12-page ACM double-column template
3 Internal mock review by a systems reader; break-condition experiment added
2 Anonymity sweep including device/trace giveaways; artifact package smoke-tested
1 Numbers regenerated from logs so PDF and artifact cannot diverge
0 Registration then paper on HotCRP before the UTC cutoff

These offsets are planning heuristics only — anchor each to the current official timetable, never to a previous cycle's calendar.

Failure modes by stage

  • Starting device measurement in November forces single-device, single-run results that read as under-evaluated — the classic MobiSys evidence reject.
  • Leaving format conversion to the final week surfaces overflow late; the 12-page double-column budget is tighter than a working draft once figures are placed.
  • Skipping the mock review forfeits the only chance to hear "your energy boundary is undefined" from a colleague instead of a reviewer.
  • Building the artifact after the paper deadline forfeits the ACM badges, which need a working script-first package the AEC can run on its own machines (mobisys-artifact-evaluation).

Coordination notes

  • Assign one named owner for the on-device measurement provenance and another for the anonymity sweep; shared ownership is how both slip.
  • Archive the exact submitted PDF, supplement, and artifact commit, since rebuttal replies must quote them precisely and camera-ready must match the reviewed version.
  • Because a miss costs a full year, decide the go/no-go on evidence completeness by the four-week mark, not on deadline night.

Output format

[Current stage] idea / building / measuring / writing / registration / submitted / rebuttal / accepted
[Next official deadline] <date and source, or unknown>
[Critical path] <three tasks that determine readiness>
[Risk register] <device evidence / page budget / anonymity / artifact / one-deadline slip>
[Owner map] <task -> person or role>