At most venues this skill would draft a rebuttal. At OSDI '26 there was no author-response period (verified 2026-07-08) — a deliberate removal, since earlier OSDI cycles had one. The author's voice therefore appears at exactly two points: before submission, inside the paper, and after a conditional accept, in the shepherding exchange. This skill covers both, plus the fallback if a future cycle reinstates a response phase (待核实 each year — check the current CFP's process section first, always).
Since no clarification channel will exist between December and March, run a pre-mortem rebuttal on the draft two to three weeks before the deadline:
osdi-writing-style).The test of the fix: a sympathetic PC member should be able to answer the objection in discussion by quoting your paper. You will not be in the room; your text is.
A conditional accept arrives with a PC-mandated change list and a shepherd who must approve the final paper by June 9 — otherwise the paper is rejected from the program. This is a response process with enforcement, and it rewards the same discipline a rebuttal would:
| Rebuttal instinct | Shepherding translation |
|---|---|
| Answer every point | Build a change matrix: mandate → action → paper location → status |
| Be concise and factual | Short status notes to the shepherd; diffs and section pointers over essays |
| Don't relitigate scores | Don't relitigate the reviews — the decision is made; only the changes matter |
| New results need care | Mandated experiments get full osdi-experiments rigor on the frozen testbed |
| Deadline discipline | Front-load: first full revision to the shepherd weeks before June 9, not on it |
change-matrix.md (shared with coauthors; mirrored in notes to the shepherd)
M1 "compare against X under skewed load" -> new fig 9 -> §5.3 -> DONE
M2 "state the consistency model precisely"-> new §3.1 defs -> §3.1 -> DRAFT
M3 "temper claims about portability" -> rewrote claims -> §1,§7 -> DONE
open question -> shepherd (2026-04-14): does M1 require both skew levels?
Two rules of tone: the shepherd is the paper's ally and its gate simultaneously — give them evidence to approve, never pressure to concede; and where a mandate seems infeasible (hardware gone, trace unlicensable), raise it immediately with an alternative, not in June with an apology.
The '26 cycle allowed roughly ten weeks from notification (March 26) to the final paper (June 9), and the artifact deadline (May 8) lands in the middle of it. A workable split for a conditional accept:
osdi-artifact-evaluation) — the same person cannot do both in the same week, so
split ownership explicitly.OSDI has had responses before and could again. If the current CFP announces one, apply the compressed classic form — and OSDI-specific emphases:
Mandated runs are the highest-risk shepherding item because they can fail:
[Cycle process] response period this year? none / exists (source: current CFP; else 待核实)
[Phase] pre-submission pre-mortem / shepherding / reinstated-response
[If pre-mortem] top objections + class (misreading/gap/disagreement) + in-text fix
[If shepherding] change matrix status <done/total>; open questions to shepherd; June risk
[Tone check] anything that relitigates instead of resolves? <flag it>