Use this as the project-management skill for a TACAS submission. Replace every date with the current ETAPS joint schedule and work backwards from the EasyChair paper deadline — remembering that for a tool or tool-demonstration paper a second, firm artifact deadline lands about two weeks later and its evaluation runs in parallel with the PC. TACAS runs a single annual review round on the shared ETAPS calendar (it does not use ESOP's two rounds), so missing the deadline costs roughly a year.
TACAS is a conference whose proceedings are an open-access LNCS volume: it has no standing editor-in-chief and no author-facing APC. Rotating leadership is the per-edition PC chairs and the ETAPS steering committee; the cost model is registration, and ETAPS funds the gold open access centrally. Chairs rotate yearly — re-check the current TACAS page rather than carrying a name forward.
As of 2026-07-09 the TACAS 2026 edition has already taken place, so the live next target is TACAS 2027 (ETAPS 2027, Copenhagen, 10-15 Apr 2027).
tacas-topic-selection) — this fixes the page limit, blind mode, and artifact obligation.| Weeks out (heuristic) | Verification-tool milestone |
|---|---|
| 10+ | Category chosen; algorithm/tool feature-frozen; benchmark set and baselines chosen |
| 8 | Experiments run; wall-clock/scalability logged on stated hardware; soundness argument drafted |
| 6 | Comparison against the strongest baseline complete with equal budgets; results tables built |
| 4 | Full draft in llncs.cls within the page limit; artifact assembled in the clean VM |
| 3 | Internal mock review by a verification-literate reader; artifact dry-run on a fresh VM |
| 2 | Tool/tool-demo: freeze the artifact for its post-paper deadline; research: anonymity sweep |
| 1 | Final PDF check; EasyChair fields, category, conflicts complete |
| 0 | Submit paper; then (tool/tool-demo) submit the mandatory artifact on its firm date |
These offsets are planning heuristics only — anchor every one to the current ETAPS joint CfP, never to a previous cycle.
[Current stage] idea / evidence / writing / submitted / rebuttal / notified / camera-ready / accepted
[Category] research / case-study / regular tool / tool-demonstration
[Next official deadline] <paper or mandatory-artifact date and source, or unknown>
[Critical path] <three tasks that determine readiness, incl. artifact for tool papers>
[Risk register] <category fit / page limit / anonymity / benchmark fairness / artifact-on-VM / presentation>
[Owner map] <task -> person or role>