A UIST acceptance is conditional: the June 27 notification (2026 cycle, verified 2026-07-08) accepts the paper as amended by your rebuttal, and the July 24 camera-ready is where those amendments come due. This phase has three workstreams — the contractual edits, the ACM production pipeline with its accessibility requirements, and conference logistics — and they share four weeks.
Reconstruct the promise ledger from your rebuttal (see uist-author-response) and
the meta-review or condition list in the notification:
Camera-ready flows through ACM TAPS (source upload, not just a PDF), and the 2026 guide adds accessible-PDF tagging via APTARA. The author-side accessibility obligations are concrete:
| Item | 2026 requirement |
|---|---|
| Alt text | Required for every figure, subfigure, and table |
| Tables | Real table markup, not images of tables |
| Math | Source-level math, not equation screenshots |
| Video | Final video figure with captions |
| PDF tagging | Applied in the TAPS/APTARA workflow from your source |
Writing alt text for an interface-systems paper is its own small craft: describe the interaction state the figure evidences, not the pixels. "Annotated sequence: a finger drags on the forearm and the cursor traces the same path on the watch, 0.3 s later" beats "screenshot of the system."
Alt-text pass over the figure inventory:
[ ] every \includegraphics has \Description{...}
[ ] every subfigure has its own description
[ ] tables described (what varies across rows/columns, the takeaway)
[ ] teaser figure description states the core interaction
[ ] no description says "image of" / "figure showing" boilerplate
acmart options from the review/anonymous configuration to the final one per the
current guide.uist-artifact-evaluation for what should be at the other
end).TAPS consumes source (LaTeX or Word), not a hand-tuned PDF, which surprises teams whose submission compiled through local hacks:
\Description{} commands are part of the source, so the alt-text pass
happens in LaTeX, not in a PDF editor afterward.| Week | Deliverable |
|---|---|
| 1 | Promise ledger reconstructed; edits assigned; e-rights initiated; registration/visa checks started |
| 2 | All contractual edits merged; +10% budget reconciled; figure originals collected |
| 3 | Alt-text pass; TAPS candidate upload; validation errors cleared |
| 4 | Final video captioned and uploaded; last TAPS build verified; buffer only |
[Contract status] promises delivered <k>/<n>; open items with owners
[Page budget] final length vs +10% allowance
[TAPS status] source uploaded / validation errors / complete
[Accessibility] alt-text pass done? tables/math as markup? video captioned?
[Logistics] e-rights · registration · visa · demo shipping — each with a date