技能 产品商业 功能采纳与激活计划

功能采纳与激活计划

v20261122
adoption-plan
该技能帮助产品团队规划用户如何发现并使用新功能。包括定义采用漏斗、将入口点映射到用户需求、设计引导和空状态、制定发布沟通计划。同时包含发布后诊断低采用率,以提升留存和参与度。
获取技能
400 次下载
概览

Adoption Plan

Shipping a feature isn't the same as users having it. Most under-used features aren't bad: they're invisible at the moment users need them, or they ask for effort before giving any value. This skill plans the path from "it exists" to "people use it every week", and gives a diagnosis when the numbers disappoint.

Phase 1: Define eligible users and the value moment

Take these from brief.md in the feature folder (docs/product/<feature-slug>/) when it exists; otherwise ask:

  • Eligible users — who should use this (role, plan, platform, the data they need). Adoption rates only mean something against this denominator, never against all users.
  • Value moment — the first action that delivers the promised value. "Opened the invoices page" isn't one; "sent a first invoice" is. If the team can't name it, stop and agree on it first: everything below depends on it.
  • Expected frequency — daily, weekly, monthly or once. It defines what "retained" means.

Phase 2: Define the funnel

StageDefinitionMetric
ExposedAn eligible user saw an entry pointreach = exposed ÷ eligible
TriedStarted the feature oncetrial rate = tried ÷ exposed
ActivatedReached the value momentactivation rate = activated ÷ tried; time to first value
RepeatedDid it again within the expected frequency windowrepeat rate
RetainedStill using it N periods laterretention at week 4, or month 3

Name the event behind each stage. When an event doesn't exist yet, list it for instrument-feature.

Phase 3: Audit discoverability

List every entry point in the code: navigation items, buttons and links in context, empty states, command palette, settings, notifications, emails, onboarding checklists, changelog. For each: where it lives, how many clicks it is from the usual landing screen, whether it's visible without scrolling, and who sees it (permissions, flags).

Then list the moments of need: the places in the product where users run into the problem the feature solves ("after exporting a CSV to build an invoice by hand"). The gap between moments of need and entry points is usually the whole adoption problem. Propose contextual entry points exactly there.

Phase 4: Design activation

Cut what the user must do before the value moment:

  • Empty states that explain what will appear and offer the primary action, with a template, sample data or an import where it helps.
  • Smart defaults so the first use works with minimal setup; move configuration after the first success.
  • A short path — run happy-path-audit from entry point to value moment and set its budget.
  • Guidance at the moment of need — one contextual hint on first encounter beats a product tour at login. Tours get skipped; hints in context get read.
  • A checklist for features with several setup steps, with progress saved.

Phase 5: Design repeat use

  • Trigger — what brings users back at the right time: their own workflow, a notification about something they care about (not "you haven't used X lately"), a reminder they chose.
  • Embedding — put the feature inside workflows people already have instead of a separate destination.
  • Accumulated value — saved state, history and templates that make the second use faster than the first.

Phase 6: Plan launch communication

Targeted, in context, and proportional to the feature: an in-app announcement shown to eligible users at the moment of need, a changelog entry, an email only for features that change how people work, and sales and support briefings for B2B. Avoid modal announcements at login: they interrupt what the user came to do and get dismissed unread.

Phase 7: Set targets and review dates

For each funnel stage: the baseline (from a comparable feature, if any), the target, and when to look — typically two weeks after launch for exposure and trial, six to eight weeks for retention. Agree in advance on what you'll do if a target is missed; launch-review runs this check at the review date.

Diagnosing low adoption after launch

Find the first stage with a sharp drop and work on that stage only:

Drop atLikely causeNext step
ExposedEntry points invisible or in the wrong placeContextual entry points at moments of need; check permissions and flags
TriedThe value isn't clear from the entry pointRewrite the entry point around the outcome, and test it (ab-test-design)
ActivatedToo much friction before valuehappy-path-audit and unhappy-paths on the activation path; watch five users try it (usability-test-plan)
RepeatedNo trigger, or the value is one-offAdd a trigger, or check whether repeat use is expected at all
RetainedThe value fades, or a better alternative existsInterview users who stopped using it (user-interviews)

Output

Write adoption-plan.md to the feature folder: eligible users, value moment, funnel with events and targets, entry-point map with proposed additions, activation and repeat-use changes, communication plan, and review dates. Summarize the biggest adoption risk and the three changes with the most impact.

信息
分类 产品商业
名称 adoption-plan
版本 v20261122
大小 5.59KB
更新时间 2026-11-25
语言