技能 效率工具 深度工作时间块规划与焦点预算

深度工作时间块规划与焦点预算

v20260826
deep-work
该技能旨在将零散的任务列表转化为结构化、有保护的日常日程。它采用深度工作方法论,将任务分类为深层和浅层,对浅层工作进行预算,并生成一套以精力为优先的日程安排。它严格执行时间限制(例如4小时深度工作上限),确保用户在一天内将专注力作为核心资源。流程包括任务审计、时间规划、会话记录和收尾仪式。
获取技能
205 次下载
概览

Deep Work — Time-Block the Day, Budget the Shallow

Portability: Reasoning-led skill with 3 stdlib Python scripts. No external APIs, no LLM calls in scripts. Works in Claude Code CLI and Claude.ai web. The scripts fix the arithmetic; you keep the judgment.

What this does

A calendar full of reactions is not a plan. This skill turns a raw task list into a day where attention is the protected resource: deep tasks get the earliest hours in blocks of at least 90 minutes, shallow work is batched into at most two windows, buffers absorb attention residue, and the schedule flatly refuses more than 4 hours of deep demand — the trained daily ceiling. A local ledger of focus sessions keeps the weekly deep-hours target measured, not felt.

Step 1 — Classify and budget the shallow

Ask for today's task list with rough minutes per task (or take it from $ARGUMENTS). The auditor classifies each task deep vs shallow (keyword heuristics; an explicit :deep/:shallow suffix always wins), computes the shallow share against the budget, and prints the forcing question for every shallow item — how long would it take to train a smart recent graduate to do this?

python scripts/shallow_work_auditor.py \
  --task "Write investor update:60" --task "Email triage:45" \
  --task "Analyze churn cohort:90:deep" --budget 50

OVER-BUDGET (exit 2) means cut, batch, or delegate before any schedule is built.

Step 2 — Block the day

Feed the surviving tasks to the planner with the day's hard start and hard end (fixed-schedule productivity: the end time does not move). Deep first and earliest, 10-minute buffers, shallow in two batches (late morning + end of day), an optional fixed lunch:

python scripts/time_block_planner.py --start 08:30 --end 17:00 --lunch 12:30 \
  --task "Write product spec:120:deep" --task "Email sweep:30:shallow"

Two refusals, both exit 2: deep demand past the 4-hour cap (the planner names what to defer), and shallow overflow past --end (the planner names what to drop — the day never silently extends).

Step 3 — Log the session, keep the streak

After each real focus block, log it. status shows this week's deep hours against the target (default 15); streak counts consecutive days with at least one session:

python scripts/focus_session_logger.py log --minutes 90 --label "Write product spec"
python scripts/focus_session_logger.py status --target 15

Step 4 — Shutdown ritual

End the day with the shutdown checklist (assets/shutdown_checklist.md): capture every open loop, glance at tomorrow, say the closing phrase. An incompletely closed day steals tomorrow's first block.

Scripts

Script Role
scripts/shallow_work_auditor.py Deep/shallow classification + shallow share vs budget → WITHIN-BUDGET / OVER-BUDGET (exit 2) + the recent-graduate forcing question per shallow item.
scripts/time_block_planner.py Energy-first schedule: deep blocks ≥90 min earliest, 4-hour deep cap (refuses, exit 2), ≤2 shallow batches, 10-min buffers, fixed lunch, overflow refusal.
scripts/focus_session_logger.py JSON ledger of focus sessions: log / status (weekly hours vs target) / streak; atomic writes.

References

Assets

Rules

  • Depth first, earliest. Deep blocks take the best hours; shallow work gets what is left, never the reverse.
  • Respect the refusals. More than 4 deep hours is fake depth; overflow past the hard stop is a broken budget, not extra output.
  • Batch, never sprinkle. Shallow work lives in at most two windows; a sprinkled inbox costs a full refocus each time.
  • Revise, don't abandon. A broken block means redraw the rest of the day, not "the plan failed."
  • Close the day. No shutdown ritual, no evening — open loops steal tomorrow's first block.

Distinct From (don't reach for the wrong skill)

  • productivity/andreessen — the 3x5 card picks WHAT matters today. Deep-work plans WHEN and HOW, with attention protected. Run the card first, then block the day here.
  • project-management capacity planning — team-level capacity and sprint math. This is one person's attention across one day and one week.

Version: 1.0.0 Build pattern: Path-B method skill — Newport discipline preserved + deterministic scheduling scripts added.