技能 编程开发 顶级系统会议相关工作撰写指南

顶级系统会议相关工作撰写指南

v20260724
asplos-related-work
本指南详细介绍了为顶级学术会议(如ASPLOS)撰写“相关工作”部分的进阶方法。核心在于将研究工作定位在多个交叉领域(架构、操作系统、编译器、加速器等),并精确地定义出与现有工作的技术边界,从而展示研究的创新性。
获取技能
159 次下载
概览

ASPLOS Related Work

An ASPLOS reviewer pool is assembled from three communities, and each reviewer checks whether their literature is handled competently. Related work at this venue is therefore a coverage problem across parallel lanes — a paper positioned beautifully against the OS literature and blankly against the architecture literature reads as half-researched to half its reviewers.

The five lanes

Lane What must be shown Failure the lane's reviewers spot
Architecture (ISCA/MICRO/HPCA lineage) The hardware structure or mechanism is new relative to prior microarchitectural work Reinvented prefetcher/hint/metadata scheme under a new name
OS/systems (SOSP/OSDI/EuroSys/ATC lineage) The policy/runtime layer differs from existing kernel or hypervisor mechanisms "The kernel already does this with tunables"
PL/compilers (PLDI/POPL/CGO lineage) Language/compiler-level alternatives are acknowledged when the problem admits them Hardware solution to a problem the compiler community solved statically
Accelerator/domain (when applicable) Placement in the accelerator design space with honest technology normalization Comparing against a three-generation-old design point
Prior ASPLOS The intersection lineage itself — what earlier cross-layer attempts did Missing the exact ASPLOS paper a PC member wrote or shepherded

For the last lane, mine the venue's own memory: the ACM DL ASPLOS series and the Influential Paper Award list (see ../../resources/exemplars/library.md) identify the papers the community regards as canonical for a given boundary.

Differentiate on the boundary, not the components

The distinctive ASPLOS positioning move: prior work usually shares components with yours (a similar hardware structure, a similar kernel policy) while drawing the hardware/software boundary elsewhere. Say precisely where each prior system draws it and why yours moves it:

Template, per closest-prior system:
  "<System> provides <capability> at <layer>, which requires <cost/assumption>.
   Because it keeps <decision> in <layer>, it cannot <the thing your boundary
   placement enables>. We move <decision> to <layer>, which is what makes
   <headline property> possible."

Three such paragraphs beat fifteen one-line dismissals — and the systems that get this treatment should be the ones a hostile reviewer would name.

Double-blind handling of your own line of work (2027 rules)

  • Cite your prior published work in the third person, treated exactly like a competitor's system.
  • Your own arXiv postings and tech reports are not prior publications under the 2027 CFP, and the submission may ignore them — you are not forced into contortions differentiating against your own preprint.
  • A workshop paper this submission extends, or your related manuscript under review elsewhere, goes in as anonymized supplemental material so reviewers can judge the delta (mechanics in asplos-supplementary).
  • Never use "removed for blind review" placeholders — disallowed wording.

Format constraints that reshape this section

ASPLOS's citation rules (verified 2026-07-08) have an underappreciated interaction with related work: every entry needs all co-authors' full first and last names and a DOI/link, which makes each citation long. Since references are outside the 11-page limit this costs no body pages — but it means bibliography hygiene is a real task: budget an editing pass to expand names (asplos-submission has the mechanical sweep) rather than discovering 90 malformed entries at the deadline.

Timing and staleness

  • Sweep the most recent two editions of ASPLOS, ISCA, MICRO, SOSP/OSDI, and PLDI before each gate (the September 9, 2026 deadline follows a spring conference season — its output is your reviewers' freshest context).
  • Concurrent work that appears between cycles: acknowledge it neutrally in a revision or camera-ready; a Major Revision's change note is an expected place to add "since submission" positioning.

Building the lane map before writing

Construct the section from a spreadsheet, not from memory:

  1. For each lane, list the 5-10 systems a reviewer from that community would expect to see; source them from the last two editions' proceedings tables of contents (ACM DL for ASPLOS/ISCA/MICRO/SOSP; the respective sites for USENIX and SIGPLAN venues) rather than from citation chains, which propagate one group's blind spots.
  2. Mark each entry: boundary-competitor (gets a template paragraph), component-overlap (grouped sentence), or context (grouped citation).
  3. Have the co-author closest to each community audit their lane's list — the embarrassing omission is almost always in the lane nobody on the team calls home.
  4. Recheck the map at every gate: between April and September a spring conference season publishes, and a reviewer's own new paper is the citation they miss first.

Using the venue's own canon

The Influential Paper Award list is a positioning instrument, not just an exemplar source: if your boundary has an award-validated ancestor (an accelerator argued from data movement, a virtualization boundary redraw — see ../../resources/exemplars/library.md), citing the lineage and stating your delta against it signals venue literacy to every senior reviewer. Conversely, discovering that a canon paper already occupies your claimed boundary is cheaper during this pass than in a review.

Where the section lives

With 11 figure-inclusive pages, a late monolithic related-work section is expensive real estate. The pattern that survives compression: inline differentiation at first mention for the two or three boundary-competitors (they are part of the argument, not an appendix to it), plus a compact lane-organized section that proves coverage. What must not be compressed away is the boundary-competitor analysis — cutting it saves half a page and costs the review that says "does not engage with <System>."

Output format

[Lane coverage] arch / OS / PL / accelerator / prior-ASPLOS — each: covered / thin / n-a
[Boundary paragraphs] closest-prior systems given the template treatment: list
[Hostile-reviewer test] the 3 systems a skeptic would name — all addressed? Y/N
[Own-work handling] third-person OK · supplements needed · arXiv stance decided
[Bibliography hygiene] full-name + DOI pass scheduled/done
[Staleness] newest cited edition per lane
信息
Category 编程开发
Name asplos-related-work
版本 v20260724
大小 6.74KB
更新时间 2026-07-28
语言