CVPR is an annual machine with one intake: in the 2026 cycle, abstracts November 6, papers November 13, supplements November 20, rebuttal late January, decisions February 20, conference June 3–7 in Denver. This skill turns that spine into a project plan with owners, because CVPR deadline weeks are lost to coordination failures more often than to science failures.
| When | Milestone | Owner discipline |
|---|---|---|
| T–10 weeks (early Sep) | Freeze scope: claims, benchmarks, baselines | PI + first author sign one paragraph |
| T–8 weeks | Experiment matrix running; recipe ledger live | Every table row has a config |
| T–6 weeks | First full draft; flip-test the figures | Co-authors annotate, don't rewrite |
| T–4 weeks (early Oct) | OpenReview profiles audited for every author | One named owner; new coauthors close the list |
| T–1 week (Nov 6) | Abstract registered; profiles valid | Desk-reject exposure if missed |
| Nov 13 | Paper + CRF submitted | Freeze 24h early; upload before the panic hour |
| Nov 20 | Supplement uploaded | Videos/code packaged per cvpr-supplementary |
| Dec – Jan 12 | Coauthors deliver their assigned reviews | Late reviews endanger your paper |
| Jan 22–29 | Reviews land; one-page rebuttal | Pre-book this week; nobody travels |
| Jan 30 – Feb 5 | Discussion (no author access) | Resist mailing the AC |
| Feb 20 | Decisions | Both branches pre-planned |
| Spring (待核实) | Camera-ready + dataset release due | See cvpr-camera-ready |
| Jun 3–7 | Conference (workshops 3–4, main 5–7 in 2026) | Poster/talk/travel logistics |
Deadline fortnight (early November). The supplement trailing the paper by a week tempts teams to leave packaging "for week two" — then week two evaporates into video rendering and code scrubbing. Rule: the supplement plan (what goes in, who builds it) is written before the paper deadline; week two only executes it.
Rebuttal week (late January). Seven days, one page, all reviewers at once. Assign roles when reviews drop, not after a day of group grief:
# rebuttal-roles.yaml — filled within 12 hours of review release
reader: # summarizes all reviews neutrally, one page, no rebuttals yet
runner: # owns the 1-2 small requested experiments; hard stop at day 5
writer: # owns the single page; everyone else feeds bullets
adjudicator: # PI decides which objections get space, which get one line
deadline: # internal freeze 24h before OpenReview close
Submitting enrolls qualifying authors into a 25k-reviewer pool, and undelivered or irresponsible reviews can desk-reject every paper the offender authored (verified 2026 enforcement). Treat December–January reviewing as a scheduled deliverable: at submission time, list which coauthors are likely reviewers, block their calendar for review weeks, and have the group's senior authors sanity-check first-time reviewers' drafts against the official reviewer guidelines.
Most labs submit several papers into the same November wall, which multiplies the process risks nonlinearly:
At a 25.42% acceptance rate, the rational plan covers rejection before it happens. The CV calendar offers a clean ladder — CVPR (Nov) → ICCV (spring deadline, odd years) / ECCV (spring deadline, even years) → WACV/3DV or back to CVPR. Rules for climbing:
cvpr-review-process).The last two weeks compress badly when run ad hoc. A schedule that has survived contact with real teams:
cvpr-writing-style), bibliography venue
verification (cvpr-related-work), CRF mandatory sections drafted.cvpr-submission; internal freeze.As of 2026-07-08, CVPR 2026 has concluded and the CVPR 2027 cycle (Seattle, reported around June 20–24, 2027) had published no CFP or deadlines. Every date above is a 2026-cycle anchor for planning shape only — reopen cvpr.thecvf.com the moment your team commits, because the deadline chain (and things like the CRF) can change between editions.
[Campaign stage] scoping / building / deadline-fortnight / in-review / rebuttal / decided
[Calendar] next 3 milestones with dates and owners
[Duty ledger] reviewing coauthors + calendar blocked: yes/no
[Risk register] top 3 (missed-profile, supplement drift, rebuttal roles, …)
[Plan B] next venue + its verified deadline
[Cycle check] current-year pages reopened on: <date>