Run the ICALP year backward from the single annual February deadline. ICALP posts one research-paper deadline per year across its two tracks, so unlike a multi-deadline venue there is no "next cycle in a few months" — a missed February means a full year lost. The calendar below is the ICALP 2026 (53rd, Royal Holloway) cycle, verified 2026-07-09; reopen the live Important Dates page and the correct track's HotCRP deadline before trusting any date.
[early February] Abstract registration (2026: 3 Feb, AoE) — title/abstract/authors/conflicts
[~3 days later] Full submission (2026: 6 Feb, AoE) — anonymized 15-page PDF + appendix
[late March] Track B rebuttal (2026: 21-24 Mar) — Track B only; Track A no general rebuttal
[late April] Notification (2026: 20 Apr)
[spring] Camera-ready in LIPIcs (lipics-v2021); exact date 待核实 per cycle
[July] Conference (2026: 7-10 Jul, workshops 6 Jul), Royal Holloway
icalp-topic-selection) and settle the model and theorem
statements; these anchor the whole paper.icalp-supplementary).icalp-submission on the near-final PDF.The tracks diverge after submission:
icalp-author-response.Do not assume both tracks behave alike, and do not count on a rebuttal for a Track A paper.
icalp-camera-ready — reformat to lipics-v2021, restore author names and
acknowledgements (de-anonymize), and hit the LIPIcs production deadline. Arrange for at least one
author to present.icalp-topic-selection's routing table — a strong result may fit
STOC/FOCS/SODA/LICS or a journal on a nearer calendar; incorporate the reviews before resubmitting.[ ] Track chosen and correct HotCRP server identified
[ ] Theorems fully proved (not just believed)
[ ] Abstract registered before the earlier February cutoff
[ ] 15-page body + complete appendix/full-version proofs
[ ] Lightweight double-blind sweep passed
[ ] Track B: rebuttal window reserved (Track A: none expected)
[ ] On accept: LIPIcs camera-ready + presenter arranged
[Cycle target] ICALP <year>, Track A / Track B
[Countdown] weeks to the February deadline; abstract-registration date
[Current stage] proving / drafting / anonymizing / submitted / rebuttal (B) / notified / camera-ready
[Track-specific] Track B rebuffer window reserved? / Track A correctness-contact readiness
[Next actions] <ordered, with dates tied to the single annual deadline>