At most conferences "author response" means a rebuttal window. Classic ICRA has
none (verify the current cycle — see icra-review-process): reviews arrive
together with the January decision. Author response at ICRA therefore happens in
three real channels, each with its own craft: the camera-ready revision after
acceptance, the RA-L response letter if the work travels the journal
pathway, and the resubmission memo after a reject. Doing these well is a
skill; pretending a rebuttal exists is a planning error.
Reviewer comments on an accepted ICRA paper are advisory — no one re-checks compliance — but ignoring them is shortsighted: reviewers are your first readers, their confusions predict everyone else's, and the same people may review the journal extension.
Triage each comment:
| Comment type | Action in camera-ready | Budget guard |
|---|---|---|
| Factual/math error caught | fix unconditionally | always fits |
| Ambiguity that misled a reviewer | rewrite the passage | high priority |
| Missing reference | add it | cheap |
| "Add experiment X" | usually defer to journal version; add only if data exists | 8-page total final limit |
| Stylistic taste | your call | lowest |
| Requests contradicting each other | pick one, note the tension in limitations | — |
Remember the geometry: submissions ran 6 content + 2 reference pages, while the 2026 final limit was 8 pages total including references — additions compete with your bibliography. Never silently change claims: if a fix weakens a number, the number changes and the text stays honest.
Work routed through RA-L (see icra-topic-selection) can receive a revise
decision, and here a real response letter exists with journal norms:
Response structure per point:
R1.3 (reviewer text quoted verbatim, trimmed fairly)
> Response: <direct answer first — yes/no/agree/disagree>
> Change: Sec. III-B, para 2 rewritten; Table II adds the n=15
> wrist-mounted condition; Fig. 4 caption now states 1× speed.
> (If disagreeing) Evidence: <measurement, citation, or derivation —
> never volume of prose>
A January ICRA reject reaches March IROS or same-week RA-L only through disciplined conversion. Write an internal memo, not a grievance:
| # | Reviewer point (quoted) | Class | Action | Where | Status |
|---|-------------------------|-------|--------|-------|--------|
| R2.1 | "success criterion never defined" | clarity | verbatim criterion added | Sec V-A | done |
| R1.4 | "compare against MPC baseline" | evidence | n=20 MPC trials run | Tab III | data 6/12 |
| R3.2 | "extend to deformables" | scope | deferred; limitation stated | Sec VII | done |
[Channel] camera-ready / RA-L letter / resubmission memo
[Comment ledger] <n> points: fix-now <n> / defer-stated <n> / risk-accepted <n>
[Evidence adds] <new trials/tables/clips committed, with dates>
[Page impact] fits final limit? <y/n + what moves>
[Repeat-reviewer check] objections addressed verbatim-quotably: y/n
[Deadline] <channel deadline and working backward date>