MobiCom's evidence culture is physical: a mobile/wireless mechanism is believed when it is measured over the air, on real hardware, under conditions that resemble deployment. A simulation-only or single-run evaluation reads as under-done here. Design the evaluation as a set of questions about the mechanism, then build the smallest measurement campaign that answers them on real radios.
Write the evaluation's subsection titles as questions first — Does the mechanism hold under mobility? What does it cost in energy at rest? When does the channel defeat it? — then design one experiment per question. The inverted approach (run everything, narrate the survivors) produces the benchmark tour that MobiCom reviews call unfocused.
A minimal matrix for a wireless-mechanism paper:
| Question | Experiment | Metrics that answer it |
|---|---|---|
| Does it work in the motivating condition? | over-the-air run under the target channel/mobility | delivery rate, goodput, SNR/BER distribution |
| What does it cost when idle? | baseline with no stress | energy-per-bit, power draw, CPU/airtime overhead |
| Why does it work? | component breakdown / ablation | per-mechanism contribution |
| Does it scale? | node / distance / density sweeps | knee location, per-node or per-meter curve |
| When does it break? | interference, deep fades, high mobility | the regime where baselines win |
| Does it hold over time? | multi-hour or multi-day runs | drift, stability, tail behavior |
Battery and harvested-energy claims are common at MobiCom and are held to instrument-level scrutiny:
Energy report checklist:
instrument: power monitor / shunt + DAQ, sampling rate
quantity: energy-per-bit or per-operation, not just average power
boundary: what is inside the measured envelope (radio only? whole tag?)
budget: for harvested/batteryless designs, the source and the duty cycle
An energy claim that cannot be re-derived from a described measurement setup should not survive your own audit.
mobicom-writing-style).mobicom-artifact-evaluation).[Evidence form] over-the-air testbed / deployment / trace / simulation (claimed vs actual)
[Question map] question -> experiment -> metric (gaps flagged)
[RF+channel] setup and conditions specified? y/n per headline experiment
[Energy] measured, with instrument and boundary? y/n
[Baseline audit] incumbent tuned? do-less present?
[Break condition] regime where the mechanism loses: <named or MISSING>
[Priority additions] ordered by review-risk reduction per testbed-week