技能 编程开发 WACV会议投稿全流程管理

WACV会议投稿全流程管理

v20260724
wacv-workflow
本指南详细介绍了WACV会议从投稿到最终发表的全周期工作流程。由于WACV采用两轮评审制,该流程图重点强调了从第一轮评审、可选的回复、修改与重投(R&R)、第二轮修改到最终定稿的复杂分支路径,是单周期规划难以覆盖的关键环节。
获取技能
231 次下载
概览

WACV Workflow

Use this to run a WACV campaign end to end. The defining feature is that WACV has two rounds with a revision path between them, so the calendar is a branching tree, not a single deadline. Dates below are the reported WACV 2027 timetable read on 2026-07-09 (via search rendering — reconfirm on the live Dates page); the structure is stable, the exact dates are not.

The branching calendar

Track + round decision  ──► Round 1 paper deadline (reported Jun 26, 2026)
                              │
                              ├─ R1 reviews (reported due Jul 24) ─► optional 1-page rebuttal
                              │
                              └─ R1 decision (reported Aug 7)
                                   ├─ Accept  ──────────────► camera-ready
                                   ├─ Reject  ──────────────► re-target / rebuild
                                   └─ Revise & Resubmit ─► revise + change summary
                                                                │
                                        Round 2 deadline (reported Aug 28) ◄─ new R2 papers also enter here
                                                                │
                                        R2 reviews (reported due Sep 25) ─ (no rebuttal)
                                                                │
                                        R2 decision (reported Oct 9) ─► Accept / Reject
                                                                │
                                        registration (reported Nov 2) ─► winter conference (Jan 2027, 待核实)

Phase-by-phase

Phase Do this Skill
Scope Decide WACV vs sibling, Applications vs Algorithms, and R1 vs R2 wacv-topic-selection
Draft Write the first page for the chosen track and the two-round reviewer wacv-writing-style
Evidence Build matched-baseline, constraint-aware experiments with uncertainty wacv-experiments, wacv-reproducibility
Submit R1 Audit anonymity, profiles, page cap, track field wacv-submission, wacv-supplementary
R1 reviews Draft the optional one-page rebuttal, AC-first wacv-author-response, wacv-review-process
R&R lap Execute the revision as a spec; write the change summary; sync the artifact wacv-author-response, wacv-artifact-evaluation
Camera-ready De-anonymize, finalize for CVF open access + IEEE Xplore wacv-camera-ready
Present Prepare the winter conference talk/poster wacv-camera-ready

Branch points a single-deadline plan misses

  • Round choice is a scheduling decision, not just a deadline. A borderline paper belongs in Round 1 (rebuttal + Revise-and-Resubmit net); a polished one can go to Round 2. Deciding this late forfeits the safety net.
  • The Revise-and-Resubmit lap is the main event, not a detour. Most WACV papers pass through it; budget real engineering time for the revision between the R1 decision and the R2 deadline, because Round 2 has no rebuttal to compensate for a rushed revision.
  • Two OpenReview groups. Round 1 and Round 2 are distinct groups; do not assume a single submission carries over automatically — follow the current instructions for resubmitting a Revise-and-Resubmit paper.

A worked mini-plan (borderline applications paper)

T-3 wk: freeze track = Applications; target Round 1 for the R&R net
T-2 wk: matched-budget baselines re-run; uncertainty over seeds/sessions locked
T-1 wk: anonymity + profile + page-cap audit (wacv-submission)
  R1 deadline: submit
+reviews: one-page rebuttal fixes the top factual objection
  R1 = Revise & Resubmit: turn the three reviews into a change list; execute; write summary
  R2 deadline: resubmit revised paper + change summary
  R2 = Accept: camera-ready; register by the deadline; prep winter poster

Reverify each cycle

  • Both round deadlines, the review/decision dates, and the registration deadline.
  • Whether the two-round model and the three R1 outcomes still hold.
  • The camera-ready deadline and the winter conference dates/location (2027 dates 待核实).

Output format

[Current phase] scope / draft / R1 submit / R1 reviews / R&R / R2 / camera-ready / present
[Round + track] R1|R2 · Applications|Algorithms
[Next hard date] <deadline> — <what it gates>
[Branch risk] <the decision that, if made late, forfeits the R&R net>
[Next skill] <which WACV skill to open now>
信息
Category 编程开发
Name wacv-workflow
版本 v20260724
大小 4.88KB
更新时间 2026-07-29
语言