技能 编程开发 代码任务验收编排器

代码任务验收编排器

v20261014
acceptance-orchestrator
该技能用于端到端编排代码任务,从问题接收、实施、审查、部署到验收验证。它作为状态机运行,确保在满足验收标准或明确升级前才结束,最小化人工干预。包含实施、审查循环、部署验证及完成门禁,确保交付质量。
获取技能
292 次下载
概览

Acceptance Orchestrator

Overview

Orchestrate coding work as a state machine that ends only when acceptance criteria are verified with evidence or the task is explicitly escalated.

Core rule: do not optimize for "code changed"; optimize for "DoD proven".

When to Use

  • The task already has an issue or clear acceptance criteria and should run end-to-end with minimal human re-intervention.
  • You need structured handoff across implementation, review, deployment, and final verification.
  • You want explicit stop conditions and escalation instead of silent partial completion.

Required Sub-Skills

  • create-issue-gate
  • closed-loop-delivery
  • verification-before-completion

Deployment and PR monitoring are project-specific capabilities, not bundled sub-skills.
Use the repository's actual deployment and review procedures; the legacy names
deploy-dev, pr-watch, pr-review-autopilot, and git-ship are not available in AAS.

Inputs

Require these inputs:

  • issue id or issue body
  • issue status
  • acceptance criteria (DoD)
  • target environment (dev default)

Fixed defaults:

  • max iteration rounds = 2
  • PR review polling = 3m -> 6m -> 10m

State Machine

  • intake
  • issue-gated
  • executing
  • review-loop
  • deploy-verify
  • accepted
  • escalated

Workflow

  1. Intake
  • Read issue and extract task goal + DoD.
  1. Issue gate
  • Use create-issue-gate logic.
  • If issue is not ready or execution gate is not allowed, stop immediately.
  • Do not implement anything while issue remains draft.
  1. Execute
  • Hand off to closed-loop-delivery for implementation and local verification.
  1. Review loop
  • If PR feedback is relevant, batch polling windows as:
  • wait 3m
  • then 6m
  • then 10m
  • After the 10m round, stop waiting and process all visible comments together.
  1. Deploy and runtime verification
  • If DoD depends on runtime behavior, verify the explicitly authorized environment.
  • A dev label does not grant deployment permission; inspect effects and use the project's deployment gate before changing any shared environment.
  • Verify with real logs/API/Lambda behavior, not assumptions.
  1. Completion gate
  • Before any claim of completion, require verification-before-completion.
  • No success claim without fresh evidence.

Stop Conditions

Move to accepted only when every acceptance criterion has matching evidence.

Move to escalated when any of these happen:

  • DoD still fails after 2 full rounds
  • missing secrets/permissions/external dependency blocks progress
  • task needs production action or destructive operation approval
  • review instructions conflict and cannot both be satisfied

Human Gates

Always stop for human confirmation on:

  • prod/stage deploys beyond agreed scope
  • destructive git/data operations
  • billing or security posture changes
  • missing user-provided acceptance criteria

Output Contract

When reporting status, always include:

  • Status: intake / executing / accepted / escalated
  • Acceptance Criteria: pass/fail checklist
  • Evidence: commands, logs, API results, or runtime proof
  • Open Risks: anything still uncertain
  • Need Human Input: smallest next decision, if blocked

Do not report "done" unless status is accepted.

Example

User request:

Take this issue and its acceptance criteria through implementation, validation, review, and a final evidence-backed verdict.

Limitations

  • Use this skill only when the task clearly matches the scope described above.
  • Do not treat the output as a substitute for environment-specific validation, testing, or expert review.
  • Stop and ask for clarification if required inputs, permissions, safety boundaries, or success criteria are missing.
信息
分类 编程开发
名称 acceptance-orchestrator
版本 v20261014
大小 4.01KB
更新时间 2026-10-16
语言