Use this as the project-management skill for a PODS submission. Replace every date with the current official timetable and work backwards from the abstract deadline, which precedes the full-paper deadline by about a week in each cycle. PODS runs multiple submission cycles per year and every paper may hit a revision round with a shepherd, so plan for a two-round-per-cycle process, not a single accept/reject.
PODS is a symposium whose papers are journal articles in the PACMMOD PODS track: it has no standing editor-in-chief and no APC in the systems sense. Rotating leadership is the per-edition PODS PC Chair (PODS 2026: Ke Yi, HKUST, verified 2026-07-09) appointed with ACM SIGMOD and SIGACT; the cost model is registration and at least one author presents. Chairs rotate yearly — re-check the organization page rather than carrying a name forward.
PODS's multi-cycle calendar is a planning lever, not just a constraint. As of 2026-07-09, PODS 2026 (Bengaluru) has already met, so the live target is PODS 2027 (Huntington Beach): Cycle 1 closed 30 May 2026, and Cycle 2 (abstract+COI 10 Oct 2026, paper 17 Oct 2026) is the next live deadline.
pods-topic-selection).acmsmall PDF (body + references + appendix) on EasyChair by
the full-paper deadline.| Weeks out (heuristic) | Theory-paper milestone |
|---|---|
| 10+ | Model and problem fixed; main theorem statements conjectured |
| 8 | Core proofs complete; lower-bound/upper-bound gap closed or scoped honestly |
| 6 | Full draft in acmsmall; every stated theorem has a complete proof in body or appendix |
| 4 | Appendix assembled and incorporated; anonymity sweep on paper and appendix |
| 3 | Internal read by a theory colleague who checks a proof end to end |
| 2 | Tighten definitions, related-work delta, page budget (15 pp excl. refs) |
| 1 | Final proof-read of the hardest proof; COI list prepared |
| 0 | Abstract by its earlier cutoff, then paper + appendix on EasyChair |
These offsets are planning heuristics only — anchor every one to the current Important Dates page, never to a previous cycle's calendar.
[Current stage] idea / proofs / writing / abstract-registered / submitted / revision / accepted
[Chosen cycle] cycle 1 / cycle 2, with the next official deadline (date + source, or unknown)
[Critical path] <three tasks that determine readiness — usually a proof gap and the appendix>
[Risk register] <open proof / page budget / anonymity / revision window / arXiv full version>
[Owner map] <task -> person or role>