Use this after SoCC reviews are released, during the round's author-response (rebuttal) window (SoCC 2026 Round 2: 10-12 Sep 2026). SoCC gives you one written turn, not a journal-style revise-and-resubmit — there is no Major Revision to repair the paper in, so the rebuttal must do all the persuading before the PC discussion decides. Because the reviewer pool is drawn from both SIGMOD and SIGOPS, a winning rebuttal answers the systems reviewer and the data/measurement reviewer, not one at the expense of the other.
Short and decision-focused. Map each reviewer to the axis they raised:
[R1 - systems] "Evaluated in simulation only?"
-> We report the 200-node testbed run in Table 2 (already in the paper, §5.2); rebuttal
clarifies it is a real deployment, not a simulator.
[R2 - measurement] "Tail latency not reported."
-> p99 attainment is in Fig. 3; we add the p99.9 breakdown from existing logs and will
include it in the final version.
[R3 - cost] "Cost claim unsupported."
-> Provisioned instance-seconds vs. the CPU baseline are in Table 2; we clarify the pricing
model used and the saving it implies.
Answer the reviewer on the axis they actually raised. Do not spend the systems reviewer's attention defending a measurement point they did not make.
| Pushback | What it signals | SoCC-ready response |
|---|---|---|
| "Simulation only / not a real system" | Systems realism doubt | Point to the testbed/deployment result, or scope the claim honestly |
| "Only average latency reported" | Missing the cloud outcome | Supply p95/p99 from existing logs; do not promise unrun experiments as fact |
| "Baseline is not tuned/fair" | Soundness of the comparison | Report the tuned-baseline number with an equal, documented budget |
| "Workload/trace is unrepresentative" | Measurement validity (data reviewer) | Justify the trace's provenance and scope; bound the external-validity limit |
| "Cost/economic claim hand-waved" | The adoption outcome is unproven | Give the cost breakdown and the pricing model behind it |
| "Overlaps prior cloud work X" | Novelty/delta doubt | Sharpen the one-sentence delta against the nearest SoCC/OSDI/NSDI work |
[Round + window] round 1 / round 2; response window dates
[Priority issues] <one decision-critical concern per reviewer>
[Axis map] each concern -> systems | measurement/data | cost/tail | novelty
[Response ledger] <concern -> correction / existing-log number / tuned baseline / bounded final-version change>
[Anonymity check] <no cluster/provider/system-name/trace leak in the response: passed/issues>