技能 编程开发 论文定稿与发表准备指南

论文定稿与发表准备指南

v20260724
mobicom-camera-ready
本指南为作者提供了将已接受的学术论文从匿名投稿阶段过渡到最终定稿(Camera-Ready)版本的全流程指导。内容涵盖去匿名化(恢复作者信息、链接)、落实所有评审承诺、完成ACM版面和版权元数据,以及规划现场会议展示,确保论文达到可发表的学术标准。
获取技能
172 次下载
概览

MobiCom Camera-Ready

Acceptance turns the paper from an anonymous 12-page argument into a published, attributed ACM record. Camera-ready is where the double-blind wrapper comes off, where every promise made during review comes due, and where ACM's publishing machinery — rights, metadata, badges — has to be completed on a fixed clock. Treat it as an audit, not a formatting pass.

De-anonymize deliberately

The final version restores what the submission hid:

Item Action
Author names and affiliations add in the ACM double-column author block
Acknowledgments and funding restore, with correct grant numbers
Self-citations convert third-person ("prior work [12]") back to first person where appropriate
Repository / dataset URLs make real (they were anonymized or withheld at submission)
PDF metadata set author/title fields correctly

Do a reverse of the blindness sweep (mobicom-submission): confirm nothing that should now be attributed is still anonymized, and nothing that should be a working link is still a placeholder.

Discharge every review promise

Continuing reviewers and readers hold you to the record. Before finalizing:

  • Fold in every change committed in the rebuttal and every required item from a one-shot revision (mobicom-author-response); a promise that silently vanishes is a credibility loss the community remembers.
  • Re-check that headline numbers in the abstract and introduction still match the final experiments after any revision re-runs (mobicom-experiments).
  • Keep the strongest result in the body — camera-ready is not the moment to demote it to an appendix to make room.

Format holds at 12 double-column pages

The final paper keeps the double-column geometry and the page discipline (the exact final page allowance and any extra-page option are 待核实 — confirm on the acceptance instructions). Figures still count; references and appendices remain outside the body cap (mobicom-supplementary). Do not let de-anonymization (a longer author block, added acknowledgments) silently push the body over.

ACM rights, metadata, and badges

Publication checklist (dates on the acceptance instructions, 待核实 per cycle):
  [ ] ACM eRights form completed; correct copyright/licensing selected
  [ ] title, authors, affiliations, abstract entered to match the PDF exactly
  [ ] ACM classification / keywords set
  [ ] artifact badges coordinated: AEC outcome reflected on the paper (Available /
      Functional / Reproduced) per the artifact timeline (`mobicom-artifact-evaluation`)
  [ ] camera-ready PDF passes the publisher's format validation

The artifact-badge timeline may run separately from the paper deadline; confirm both clocks so a badge you earned actually appears on the published version.

Plan the in-person talk

MobiCom 2026 is in Austin, October 26-30, 2026; accepted papers are presented in person (exact presenter and registration requirements are 待核实 — read the author instructions). Plan early:

  • Designate the presenter and confirm travel and registration against the program dates.
  • Build the talk around the mechanism and its measured evidence, the same arc as the paper's first page (mobicom-writing-style) — a demo or a short over-the-air video often lands harder than a results table.
  • Prepare for the wireless-specific questions reviewers raised: channel conditions, mobility realism, energy boundary.

Final checklist

  • De-anonymized fully; reverse blindness sweep passed.
  • Every rebuttal/revision promise folded in and consistent.
  • Headline numbers match final experiments.
  • Double-column format holds; body within the page allowance.
  • ACM rights + metadata complete; badges coordinated.
  • Presenter designated; talk built on the mechanism→evidence arc.

Output format

[De-anon] author block / ack / links / metadata restored — gaps flagged
[Promises] rebuttal + revision commitments discharged? each listed
[Format] page/column check after de-anon
[Publishing] rights / metadata / badge status
[Talk] presenter + registration + demo plan
信息
Category 编程开发
Name mobicom-camera-ready
版本 v20260724
大小 4.46KB
更新时间 2026-07-28
语言