本技能提供了一套完整的学术论文投稿和迭代流程。它指导研究团队如何规划OOSLA论文的整个生命周期,包括选择最佳投稿时间(十月或三月)、管理论文状态机(接受、小修、大修、拒稿),预留修订时间,并规划论文产出物和演讲,确保研究成果顺利发表。
获取技能
425 次下载
概览

OOPSLA Workflow

OOPSLA gives a paper two doors per year into the same PACMPL volume — for
2026, October 10, 2025 (Round 1 → Issue OOPSLA1, published from April 1,
2026) and March 17, 2026 (Round 2 → Issue OOPSLA2, from October 1, 2026),
with all outcomes presented at SPLASH (Oakland, October 4–9, 2026; OOPSLA
talks October 5–7). Planning an OOPSLA campaign is therefore a routing
problem over rounds and revision outcomes, not a countdown to a single
deadline. As of 2026-07-08 the next open door is the 2027 volume's Round 1,
CFP not yet posted (待核实) — re-anchor every date below to live pages.

Door choice: October vs March

FactorFavors the October roundFavors the March round
Revision insuranceMajor Revision lands in March, same volumeMajor Revision waits ~7 months for next volume's R1
Publication timingApril issue; citable before the conferenceOctober issue; publishes near conference time
Evidence maturityRequires the evaluation done by early fallBuys a winter of experiments
Team calendarSummer build, fall writeFall build, winter write
Talk lead timeLong runway to SPLASHAcceptance close to travel booking

Default heuristic: enter the earliest round where the evidence (not the
prose) is complete — the revision insurance of the early round compounds,
because the most likely non-accept outcome for solid work is a revision, and
same-volume revision is the cheapest one available anywhere in the SIGPLAN
family.

Campaign state machine

PLAN ──> ROUND N SUBMITTED ──> RESPONSE WINDOW ──> outcome?
  Accept ─────────────► CAMERA-READY ► ARTIFACT ► ISSUE ► SPLASH TALK
  Minor Revision ─────► execute list, same round ► (as Accept)
  Major Revision ─────► revise against expectations ► ROUND N+1 (same
                        reviewers where possible)
  Reject ─────────────► diagnose ► re-route (oopsla-topic-selection)
                        or rebuild ► a later round
Each transition has an owner and a date pulled from the live track page.

Backward plan from a target round (T = deadline)

  • T-12 to T-8 weeks — freeze claim list; run oopsla-experiments

routing; start the demand matrix and reproducibility ledger.

  • T-8 to T-4 — full draft in the 23-page frame; related-work family

sweep (oopsla-related-work); internal red-team read using the four
SIGPLAN pillars.

  • T-4 to T-1 — style pass (oopsla-writing-style); appendix layering

(oopsla-supplementary); Data-Availability Statement drafted from the
ledger.

  • Final 72 hours — the filing-day sequence in oopsla-submission.
  • Post-submission — pre-write response scaffolding: the concerns you

already know about, with PDF pointers ready for the four-day window.

Revision-path budgeting

Reserve capacity after submission: the two most probable outcomes for
competent work — Minor and Major Revision — both demand engineering time on
a fixed clock. A team that disbands to other projects the week after the
deadline systematically converts Minor Revisions into missed opportunities.
Rule of thumb: hold 20% of the build team's time in reserve until the
outcome letter, then re-plan against the actual expectation list.

Post-acceptance rail

Camera-ready reconciliation (oopsla-camera-ready) → artifact kick-the-tires
and badges (oopsla-artifact-evaluation) → Zenodo DOI into the final
statement → issue publication → SPLASH registration, talk, and optional
poster. The talk lands months after OOPSLA1 publication — plan it as a
presentation of known work, and budget travel to the SPLASH city early.

Output format

[Cycle anchor] current volume + next open round (live URL + date checked)
[Door choice] round + rationale from the table
[State] position in the state machine
[Reserve] revision capacity held + expiry
[Next transition] owner, date, blocking items